Study on the Operating Minima According to the Required Navigation Performance:

mandatory authorization (RNP AR)

Authors

  • Clóvis Fernandes Júnior Segundo Centro Integrado de Defesa Aérea e Controle de Tráfego Aéreo (CINDACTA II) Divisão de Operações Curitiba - PR

DOI:

https://doi.org/10.22480/revunifa.2012.25.691

Keywords:

Aerodrome, Operating minima, Approach Procedures, Air Navigation Procedures, RNP AR

Abstract

The publication of a new concept of air navigation, called RNP AR, triggered an interest in increasing the knowledge on the aspects that affect aerodrome operating minima calculation, particularly regarding the obstacle influence. In this sense, the present study aimed to examine to what extent the concept RNP AR could reduce the influence that the terrain exerts on determining the approach operating minima of Santos Dumont 02R runway and of Joinville Airport 15 runway. According to the proposed methodology, the work started with the presentation of the theoretical framework, particularly regarding the definition of aerodrome operating minima and the description of RNP AR concept. Then, experimental research was conducted and the aerodromes operating minima were calculated. At the end of the study, after comparing the results with the current operating minima, it was observed that the RNP AR concept led to a reduction of the aerodrome operating minima of Joinville Airport, which could promote an improvement in the operational conditions in this aerodrome. However, the same result was not achieved at the Santos Dumont airport, which means that the RNP AR concept cannot be applied to all situations and that a
careful analysis must be performed before its implementation.

References

BRASIL. Ministério da Defesa. Comando da Aeronáutica. AIP-MAP: Publicação de Informações Aeronáuticas. Brasília, DF, 2011.

______. CIRCEA 100-53: Padronização da elaboração de procedimentos de Navegação Aérea. Brasília, DF, 2011.

______. ICA 100-24: Elaboração de procedimentos de navegação aérea. Brasília, DF, 2008.

GIL, A. C. Como elaborar projetos de pesquisa. 4. ed.São Paulo: Atlas, 2007.

GJERLEV, J. Instrument flight procedures. Oslo: Pilotforlaget, 2002.

INFRAERO - Empresa Brasileira de Infra-Estrutura Aeroportuária. Aeroporto Santos-Dumont. Disponível em: <http://www.infraero.gov.br/index.php/br/aeroportos/rio-de-janeiro/aeroporto-santos-dumont.html>. Acesso em: 14 mar. 2011.

MIRANDA, E. E. (Coord.). Brasil em relevo. Campinas: Embrapa Monitoramento por Satélite, 2005. Disponível em: <http://www.relevobr.cnpm.embrapa.br>. Acesso em: 25 abr. 2011.

NAVERUS. Access on top of the world: Linzhi. Disponível em: <http://www.naverus.com/Community/Case_Studies/Linzhi.htm>. Acesso em: 24 abr. 2011.

OACI - Organização da Aviação Civil Internacional. ANNEX 6: Operation of Aircraft - Part I, International Commercial Air Transport — Aeroplanes. Montreal: OACI, 2010.

______. DOC 9368: Instrument Flight Procedures Construction Manual. Montreal: OACI, 2002.

______. DOC 9905: Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual. Montreal: OACI, 2009.

Instituto de Pesquisa Econômica Aplicada. IPEA divulgaestudo sobre aeroportos no Brasil. Disponível em: <http://www.ipea.gov.br/portal/index.php?option=com_content&view=article&id=8032 >. Acesso em: 30 abr.2011.

SIQUEIRA, C. A. Navegação aérea segundo o conceito CNS/ATM: custos e benefícios. 2005. 129 f. Dissertação (Mestrado) - ITA, São José dos Campos, 2005.

Published

2012-07-01

How to Cite

Study on the Operating Minima According to the Required Navigation Performance:: mandatory authorization (RNP AR). The Journal of the University of the Air Force , Rio de Janeiro, v. 25, n. 30, 2012. DOI: 10.22480/revunifa.2012.25.691. Disponível em: https://revistadaunifa.fab.mil.br/index.php/reunifa/article/view/691.. Acesso em: 25 nov. 2024.

Similar Articles

121-130 of 460

You may also start an advanced similarity search for this article.